Main switchboard Operation and Handling Procedure

Before Entering an electrical switchboard room

Informations and item required  

Step 1 : Inspection Requirement

Step 2 : Testing Requirement

 How to perform insulation test, click here.

Step 3 : Finalize inspection  

Step 4 :  Energizing the MSB  

  *For MCCB main isolator, there is no spring charge procedure required.

Step 5: Switch ON outgoing MCCB to SDB.

Step 6: Job done / Ending